Revision Summary

Summary of Changes in 2025

Note: Replaced "Worker" with Employee in all sections

Section Section title Description
COVER COVER Publication Date
Section A Operating Authority New section; Patrolling Requirements
Section B Communications No Changes
Section C Safety Cards No Changes
Section D Tagging Procedures Adding Distribution SCADA Switches and Reclosers
Section E Clearance Procedures Substation Islanding
Section F Field Clearance Procedures No Changes
Section G General Operating Procedures No Changes
Section H Substation Switching Procedures No Changes
Section I Substation Voltage Regulators, LTC’s and Controls No Changes
Section J Distribution Switching Devices and Equipment Adding Distribution SCADA Switches and Reclosers
Section K Transmission Switching Procedures No Changes
Section L District Generating Facilities Updated language around demarcation points, LOTO for JHP, Youngs Creek, and Woods Creek.
Section M Appendix I No Changes
Section N Appendix II No Changes
Note   No notes

Summary of Changes in 2024

Section Section title Description
COVER COVER Publication Date
Section A Patrolling Requirements New section
Section B Communications No Changes
Section C Safety Cards No Changes
Section D Tagging Procedures No Changes
Section E Clearance Procedures No Changes
Section F Field Clearance Procedures Updated definition of a "lateral", and specifies field clearances are only allowed on hot taps and not wedge or bolted connections.
Section G General Operating Procedures No Changes
Section H Substation Switching Procedures No Changes
Section I Substation Voltage Regulators, LTC’s and Controls No Changes
Section J Distribution Switching Devices and Equipment No Changes
Section K Transmission Switching Procedures No Changes
Section L District Generating Facilities No Changes
Section M Appendix I No Changes
Section N Appendix II No Changes
Note   No notes

Summary of Changes in 2022

Section Section title Description
Section F Field Clearances Field Clearance subheading updated
COVER COVER Publication Date
Section A Patrolling Requirements New section
Section B Communications No Changes
Section C Safety Cards No Changes
Section D Tagging Procedures Added language for breaker lockout, Steps 1&2
Section E Clearance Procedures for District Employees Added “Recloser bypass switches are not preferred devices for clearance points but may be used as a clearance point if agreed to by the clearance holder.”
  Clearance Procedures for Tree Trimmers Tree Trimers shall always treat the conductor(s) or equipment as ENERGIZED and maintain minimum approach distances noted in WAC 296-45-325 table 2 unless working under a clearance with equal potential grounding in place.
Section F Field Clearance Procedures Step 1: Lead Employee, submits a completed Switching Request to ECC (See Section A)
Step 2: Lead Employee, Verifies the location of the worksite and clearance point
Step 3 (previous step 2)
Step 4 (previous step 3)
Step 5 (previous step 4)
Section G General Operating Procedures No Changes
Section H Substation Switching Procedures No Changes
Section I Substation Voltage Regulators, LTC’s and Controls No Changes
Section J Distribution Switching Devices and Equipment No Changes
Section K Transmission Switching Procedures No Changes
Section L District Generating Facilities Added Arlington Microgrid
Section M Appendix I No Changes
Section N Appendix II Defining Hot Line Hold
Note   Energy Control Center has been abbreviated in several areas. Several typos have been corrected throughout that have no impact on operations.