Revision Summary
Summary of Changes in 2025
Note: Replaced "Worker" with Employee in all sections
Section | Section title | Description |
---|---|---|
COVER | COVER | Publication Date |
Section A | Operating Authority | New section; Patrolling Requirements |
Section B | Communications | No Changes |
Section C | Safety Cards | No Changes |
Section D | Tagging Procedures | Adding Distribution SCADA Switches and Reclosers |
Section E | Clearance Procedures | Substation Islanding |
Section F | Field Clearance Procedures | No Changes |
Section G | General Operating Procedures | No Changes |
Section H | Substation Switching Procedures | No Changes |
Section I | Substation Voltage Regulators, LTC’s and Controls | No Changes |
Section J | Distribution Switching Devices and Equipment | Adding Distribution SCADA Switches and Reclosers |
Section K | Transmission Switching Procedures | No Changes |
Section L | District Generating Facilities | Updated language around demarcation points, LOTO for JHP, Youngs Creek, and Woods Creek. |
Section M | Appendix I | No Changes |
Section N | Appendix II | No Changes |
Note | No notes |
Summary of Changes in 2024
Section | Section title | Description |
---|---|---|
COVER | COVER | Publication Date |
Section A | Patrolling Requirements | New section |
Section B | Communications | No Changes |
Section C | Safety Cards | No Changes |
Section D | Tagging Procedures | No Changes |
Section E | Clearance Procedures | No Changes |
Section F | Field Clearance Procedures | Updated definition of a "lateral", and specifies field clearances are only allowed on hot taps and not wedge or bolted connections. |
Section G | General Operating Procedures | No Changes |
Section H | Substation Switching Procedures | No Changes |
Section I | Substation Voltage Regulators, LTC’s and Controls | No Changes |
Section J | Distribution Switching Devices and Equipment | No Changes |
Section K | Transmission Switching Procedures | No Changes |
Section L | District Generating Facilities | No Changes |
Section M | Appendix I | No Changes |
Section N | Appendix II | No Changes |
Note | No notes |
Summary of Changes in 2022
Section | Section title | Description |
---|---|---|
Section F | Field Clearances | Field Clearance subheading updated |
COVER | COVER | Publication Date |
Section A | Patrolling Requirements | New section |
Section B | Communications | No Changes |
Section C | Safety Cards | No Changes |
Section D | Tagging Procedures | Added language for breaker lockout, Steps 1&2 |
Section E | Clearance Procedures for District Employees | Added “Recloser bypass switches are not preferred devices for clearance points but may be used as a clearance point if agreed to by the clearance holder.” |
Clearance Procedures for Tree Trimmers | Tree Trimers shall always treat the conductor(s) or equipment as ENERGIZED and maintain minimum approach distances noted in WAC 296-45-325 table 2 unless working under a clearance with equal potential grounding in place. | |
Section F | Field Clearance Procedures | Step 1: Lead Employee, submits a completed
Switching Request to ECC (See Section A)
Step 2: Lead Employee, Verifies the location of the worksite and clearance point Step 3 (previous step 2) Step 4 (previous step 3) Step 5 (previous step 4) |
Section G | General Operating Procedures | No Changes |
Section H | Substation Switching Procedures | No Changes |
Section I | Substation Voltage Regulators, LTC’s and Controls | No Changes |
Section J | Distribution Switching Devices and Equipment | No Changes |
Section K | Transmission Switching Procedures | No Changes |
Section L | District Generating Facilities | Added Arlington Microgrid |
Section M | Appendix I | No Changes |
Section N | Appendix II | Defining Hot Line Hold |
Note | Energy Control Center has been abbreviated in several areas. Several typos have been corrected throughout that have no impact on operations. |